Base Isolators arrive on site

151 Cambridge - Southbase - 19  Dec '13 - 03

 

 

 

 

 

 

 

The first of the 19 highly engineered Base Isolators arrived on site pre Christmas and are now being installed.

Lead engineer Grant Wilby from Aurecon describes ┬áBase isolation as “the most advanced seismic protection system available and provides the greatest protection to buildings and their occupants.”

To see the base isolators in action, view the video here;

Base Isolator in action

Posted in Uncategorized.